Car park refurbishment at Düsseldorf Airport
Key Facts
Location: Düsseldorf
System: Triflex ProPark, Triflex ProDeck
Completion: August 2023
Area: 22,000 m², of which 6,000 m² with Triflex SAM
Authorised Contractor: K-T-K GmbH, Warstein
Car park refurbishment at Düsseldorf Airport
Planned, helped, solved. All together. Car parks have large surfaces, the renovation of which can be time-consuming and disruptive to operations. The P3 terminal car park at Düsseldorf Airport was therefore to be refurbished in stages in order to ensure that at least limited operations could continue. The decision was made to use a sealing and coating system based on polymethyl methacrylate (PMMA) to minimise closure times. This not only cures quickly, it can now also be applied mechanically with a spray gun thanks to the Triflex SAM product innovation from the Minden-based liquid plastic specialist Triflex. This saves even more time - and protects both the environment and the applicator.
Refurbishment requirements
Protection of the concrete substrate against chloride-induced corrosion damage
Tested and approved product
Possibility of a coloured design
Realisation of connections to building components
Sustainable renovation and short closure times
Fulfilment of fire protection requirements for sealing and marking
Refurbishment steps overview
Substrate pre-treatment by milling, shot blasting and grinding
Surface priming with Triflex SAM spray application and Triflex Cryl Primer 287
Positioning surfaces treated with Triflex ProDeck and mesh fabric
Waterproofing of all component connections with Triflex ProDetail and Triflex Special Fleece
Surface waterproofing with ProPark, variant II
Formation of the wearing course of all carriageways with Triflex ProDeck
Sealing with Triflex SAM spray application and Triflex Cryl Finish 209 in anthracite